Government Is On Its Way To Achieving 175 GW Target For Installed Renewable Energy Capacity By 2022

Government Is On Its Way To Achieving 175 GW Target For Installed Renewable Energy Capacity By 2022

The Ministry of New and Renewable Energy (MNRE) has taken several steps to fructify Prime Minister Shri Narendra Modi’s dream of a clean energy future for the ‘New India’. The largest renewable capacity expansion programme in the world is being taken up by India. The government is aiming to increase share of clean energy through massive thrust in renewables. Core drivers for development and deployment of new and renewable energy in India have been Energy security, Electricity shortages, Energy Access, Climate change etc.

A capacity addition of 27.07 GW of renewable energy has been reported during the last three and half years under Grid Connected Renewable Power, which include 12.87 GW from Solar Power, 11.70 GW from Wind Power, 0.59 from Small Hydro Power and 0.79 from Bio-power. Confident by the growth rate in clean energy sector, the Government of India in its submission to the United Nations Frame Work Convention on Climate Change on Intended Nationally Determined Contribution (INDC) has stated that India will achieve 40% cumulative Electric power capacity from non-fossil fuel based energy resources by 2030 with the help of transfer of technology and low cost International Finance including from Green Climate Fund. As on 30.11.2017, Solar Energy Projects with an aggregate capacity of over 16611.73 MW including 863.92 MW from Solar Roof Top projects has been installed in the country. Read More…

Leave a Reply

Your email address will not be published.