Kochi Metro to double its solar power usage to 40 per cent

Kochi Metro to double its solar power usage to 40 per cent

The second phase powering of Kochi Metro with solar power will be inaugurated on Monday with the installation of panels at Muttom yard. This will double Metro’s solar power usage to 40%. The panels will be installed at four hectares of the marshy land at Muttom.

Failure in power supply halts Metro service

Failure in power supply halts Metro service

The Kochi Metro services came to a brief halt on Sunday morning due to failure in power supply from Kalamassery substation. The Metro services stopped for about 15 minutes from 11.14am to 11.30am following the interruption.

1 2 3